Successful Completion of Stormwater Detention Project at Brookfield School, Tauranga

Excavtors in Tauranga for the Brookfield Project

Johnstone Construction successfully completed one of their larger stormwater detention projects in Tauranga. The Brookfield school tank install project involved the implementation of the innovative Maskell Fibreglass Tank Systems to effectively manage stormwater runoff and ensure the long-term sustainability of the school's drainage infrastructure. By. utilising the Maskell Fibreglass Tank Systems, the project successfully enhanced flood protection promoted sustainable water management practices, and delivered a cost-effective solution.

The Maskell Fibreglass Tank Systems have revolutionised the industry with their lightweight and robust design, making installation a breeze while ensuring long-term reliability. These tanks are corrosion-resistant, which means they are built to last, reducing maintenance costs and environmental impact over time.

The Stormwater Detention Project aimed to address the challenges posed by heavy rainfall events that frequently impacted the school's premises, leading to water pooling and potential damage to the school grounds. Johnstone Construction was entrusted with designing and constructing an efficient stormwater detention system that would effectively collect, store, and release excess stormwater in a controlled manner.